Beamline shutdown

If the beamline is going off the air for more than 3 days, these are some of the things to do:

  1. Call Safety Coordinator, and get beamline locked out.

  2. Turn of HV to proportional counter, and turn off helium and counter gas flow at bottle only.

  3. Fill out a weekly check list, including a computer-list of all motor positions. Measure mirror shaft lengths.

  4. Consider closing valves, depending on nature of shutdown.

  5. Consider running Ti sublimators for 2 minutes each.

  6. Do an overall cleanup. Is the zone plate secure?



Holger Fleckenstein 2008-07-08